This website uses cookies to ensure you get the best experience on our website. Learn more

One Day Pilot

x
One Day Pilot
One Day Pilot
One Day Pilot
One Day Pilot
One Day Pilot
One Day Pilot
One Day Pilot
One Day Pilot
One Day Pilot
One Day Pilot
One Day Pilot
One Day Pilot
One Day Pilot
One Day Pilot
One Day Pilot
Address:
9-1a Jalan Perdana 4/8 | Cheras, Kuala Lumpur 47200, Malaysia

Line 1 of the Mumbai Metro, also referred to as Metro I or the Versova-Andheri-Ghatkopar corridor, is part of the metro system for the city of Mumbai, India. The 11.40 km line is fully elevated, and consists of 12 stations from Versova to Ghatkopar. The line connects the eastern and western suburbs of Mumbai. It was built at an estimated cost of ₹4,321 crore and is operated by the Metro One Operation Pvt Ltd on a 5-year contract. The MOOPL is a joint venture company owned by Reliance Infrastructure and RATP Dev Transdev Asia .Line 1 started operations on 8 June 2014. It has the eighth highest passenger density of any metro line in the world. Line 1 has the steepest curve of any metro line in India. There are a total of 64 curves on the line, with the steepest curve being 107 metres.
Continue reading...
From Wikipedia, the free encyclopedia.

Attraction Location



One Day Pilot Videos

Menu